The Croatian authorities has allotted €60 million ($65.6 million) in subsidies for companies to put in 80 MW of renewables and 20 MWh of batteries.
The Croatian authorities has offered €60 million for corporations within the processing trade and the heating sector to put in front-of-the-meter and behind-the-meter PV arrays, biomass tasks, energy vegetation powered by biogas, and battery storage installations.
That is Croatia’s first public name for subsidies to return from the European Union’s Modernization Fund, which was established in 2021 to assist 10 member states improve their grids and meet 2030 targets. of power. The Croatian Ministry of Financial system and Sustainable Growth says that the purpose is for corporations to supply power for self-consumption, which ought to decrease power prices.
Firms can safe between €100,000 and €2 million per undertaking. Builders can apply for a number of tasks, with the utmost quantity per applicant restricted to €4 million. The ministry mentioned it expects the investments to offer 80 MW of renewable power capability and 20 MWh of power storage capability.
As well as, the ministry mentioned that it’s also making ready to allocate € 80 million of funds for investments in power effectivity and excessive effectivity co-generation within the processing trade.
The most recent announcement carefully follows the European Fee’s determination to refer Croatia, Hungary, and Portugal to the Court docket of Justice of the European Union (CJEU) for failing to transpose the EU Renewable Vitality Directive into nationwide laws. on June 30, 2021. The directive, adopted in 2018, units an EU-level binding goal for 2030 of at the very least 32% renewable power, amongst different measures.
Nonetheless, Croatia introduced its ultimate Nationwide and Local weather Plan (NECP) in October 2021. It targets a 36.4% share for renewable power in 2030 and investments in your complete power sector, together with hydropower, wind farm, photo voltaic plant, and hydrogen power.
In response to the UK-based consulting agency GlobalData, Croatia is now on course to fulfill this goal, though its photo voltaic PV deployment is scorching thus far. The nation may add simply 2.5 MW of recent photo voltaic capability by 2022, and one other 19 MW subsequent yr, GlobalData mentioned in December.
The Worldwide Renewable Vitality Company (IRENA) says Croatia may have 309 MW of put in PV capability by the tip of 2021. GlobalData expects the nation to succeed in 770 MW of cumulative photo voltaic capability by 2030.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: editors@pv-magazine.com.