Close Menu
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Solar

    Linyang Energy to build 20 GW TOPCon factory – pv magazine International

    By December 7, 2022No Comments2 Mins Read

    Linyang Vitality unveiled plans to construct a brand new photo voltaic manufacturing facility in Jiangsu province, whereas Daqo stated it would construct a brand new silicon manufacturing base in Interior Mongolia.

    December 7, 2022 Emiliano Bellini

    A polysilicon manufacturing facility in China

    Picture: Daqo New Vitality

    Line Vitality revealed that it has signed an settlement with the federal government of Nantong, Jiangsu province, to construct a 20 GW photo voltaic module manufacturing facility. The ability, which is able to produce n-type TOPCon photo voltaic modules and will probably be in-built two phases, with a capability of 12 GW and eight GW respectively. The corporate will make investments practically CNY 10 billion ($1.43 billion) within the mission. In November, Linyang Vitality commissioned a ten GWh lithium iron phosphate battery manufacturing facility in Jiangsu.

    That is proper stated it would quickly proceed with the development of a 100,000-metric-ton (MT) manufacturing base in Baotou, Interior Mongolia. The CNY 9.2 billion mission is the second section of the 200,000 MT polysilicon hub it’s growing within the space. The corporate stated the entire manufacturing capability will attain 305,000 MT by the tip of subsequent 12 months.

    Shangji Automation stated a hearth broke out at its new manufacturing facility in Xuzhou, Jiangsu province, the place it plans to fabricate wafers and photo voltaic cells. The hearth began on Friday afternoon and was extinguished after 5 and a half hours. 5 folks died and two have been injured. The native authorities have fashioned a staff to research the reason for the accident. The corporate stated the fireplace will delay development of the manufacturing facility, however it is not going to have an effect on present wafer capability and operations.

    This content material is protected by copyright and will not be reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: [email protected].

    Source link

    Related Posts

    What Is a Hydrogen Energy Storage System and How Does It Work?

    April 14, 2025

    MCPV to build 3 GW solar cell, module factory in Netherlands – pv magazine International

    July 17, 2023

    Fire hits industrial building, PV system in Switzerland – pv magazine International

    July 17, 2023
    Leave A Reply Cancel Reply

    • sitemap

    Type above and press Enter to search. Press Esc to cancel.