Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

    April 25, 2025

    Why the OUPES Portable Power Station Is a Must-Have for Every Home

    April 23, 2025

    What Is a Hydrogen Energy Storage System and How Does It Work?

    April 14, 2025
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Home»Solar Energy»Coloradans accuse Xcel of dragging its feet on solar installations to protect its profits
    Solar Energy

    Coloradans accuse Xcel of dragging its feet on solar installations to protect its profits

    By February 1, 2023No Comments3 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Some photo voltaic clients and installers say Xcel Power is deliberately delaying lots of of photo voltaic connections throughout the state to keep away from dropping cash.

    They stated it’ll take six months for the utility to put in the meters that join the photo voltaic installations to the grid.

    “They do not have the urgency to place it in as a result of, as quickly as they put it in, the revenue meter goes down,” stated Paul Webster.

    He and his spouse June determined to retire to Colorado final 12 months and says his son, who lives right here, and our solar, which shines 300 days a 12 months, had lots to do with it. .

    “Once we’re speaking about our future we wish to be certain that we’re off the grid as a lot as potential,” June Webster stated.

    They’ve a rooftop photo voltaic system put in in time for winter, however they’re going to be fortunate to make use of any power earlier than winter ends, “It is a good sunny day on the market at present and I am paying my electrical energy invoice,” stated Paul Webster. “I’ve 18 panels on my roof and I pay for the electrical energy after I pay for the photo voltaic set up. ‘The earlier the higher,’ is all I can say.”

    Xcel blamed excessive demand for photo voltaic installations. Mike Kruger with the Colorado Photo voltaic and Storage Affiliation, which represents 275 firms, regretted a brand new portal launched by the utility final summer season: “It was a catastrophe from begin to end – misplaced initiatives, initiatives are delayed, bizarre error messages. Each roofing firm. that works with Xcel is coping with this.”

    Kruger stated the delay affected lots of of consumers, who had been paying for techniques they could not use. In the meantime, he stated, the businesses misplaced lots of of hundreds of {dollars} as a result of most of them weren’t paid for the installations till the power flowed to them.

    “Financially it is devastating,” stated Doug Southard, proprietor of Southard’s Photo voltaic Power and Development.

    After 17 years in enterprise, he stated he struggles to maintain his doorways open: “There isn’t any accountability on Xcel’s facet to do it proper, which is killing small contractors.”

    He says he has 29 clients ready for Xcel and a few of them, he stated, have been ready since Could 2022: “This can be a billion-dollar firm. Bringing different individuals from different areas. It doesn’t disappoint.”

    The Websters additionally need accountability. “I would wish to see them fined each month it takes,” June stated.

    Kruger known as on the Public Utilities Fee and the legislature to behave: “Endlessly, with continued failure, and continued impression on clients and companies, it is time the individuals with regulatory energy and legislatively do one thing.”

    He stated the delays began a 12 months in the past and are worse with the brand new portal. Xcel stated it’s within the strategy of hiring extra crews and stated it processed greater than 18,000 purposes to attach photo voltaic to the grid final 12 months — a 34% improve over 2021.

    The Public Utilities Fee is investigating the delays however has no phrase on when, or if, it’ll act.

    Shaun Boyd

    shaun-boyd.jpg

    Shaun Boyd is CBS Information Colorado’s Political Specialist. Learn his newest stories or view his bio and ship him an electronic mail.

    Source link

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

      Related Posts

      Shenzhen Sunlith Energy Co., Ltd. Launches One-Stop Solution for Solar and Energy Storage Products

      October 24, 2023

      1st phase of Mexican solar project to be operating in April

      February 2, 2023

      Unitarian Universalists score solar panels with grant – The Campus

      February 2, 2023

      Comments are closed.

      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      What is Sustainable energy?

      December 7, 2022

      Solar Energy Storage Benefits

      December 23, 2022
      Don't Miss
      Energy Storage System

      Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

      By cindy kApril 25, 20250

      The Hidden Risk in Plain Sight: In the heart of every energy storage system lies…

      Why the OUPES Portable Power Station Is a Must-Have for Every Home

      April 23, 2025

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      How to Match Solar Capacity with Lithium Battery Capacity in Your Campervan

      February 23, 2024
      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Solar Energy Storage Benefits

      December 23, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      Subscribe to Updates

      Get the latest creative news from SmartMag about art & design.

      • sitemap

      Type above and press Enter to search. Press Esc to cancel.