Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

    April 25, 2025

    Why the OUPES Portable Power Station Is a Must-Have for Every Home

    April 23, 2025

    What Is a Hydrogen Energy Storage System and How Does It Work?

    April 14, 2025
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Home»Solar Inverter»Fresh plans for Claregalway solar farm development
    Solar Inverter

    Fresh plans for Claregalway solar farm development

    cindy kBy cindy kNovember 23, 2022No Comments1 Min Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Galway Daily news New plans for Claregalway solar farm development

    A new application has been made for a 25ha expansion of a solar farm to be built between Claregalway and Athenry.

    Renewable Energy Systems Ltd is seeking planning permission for a solar energy development on land in Ballymoneen/Grange East.

    It consists of solar panels on ground mounted frames, along with 8 inverter substations, security fencing and cameras, access tracks, and cabling.

    It will act as an extension of the 140ha Ballymoneen Solar Farm, for which RES received planning permission in January 2021.

    The development will be spread across five parcels of land on the subject, approximately 0.5km to the east of Cregmore Park Golf Club.

    The application states that the solar farm would be operational for 35 years if approved.

    Planning permission was previously refused by the county council for an extension to the approved Ballymoneen Solar Farm on this site.

    The council rejected a similar application in August, saying it was against a condition attached to the planning permission for that development.

    A decision on this new planning application is due from the county council on January 6 next year.

    Source link

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
    cindy k

      Related Posts

      Why the OUPES Portable Power Station Is a Must-Have for Every Home

      April 23, 2025

      Empowering Your Adventures: The Ultimate Portable Power Station Guide

      October 27, 2023

      Shenzhen Sunlith Energy Co., Ltd. Launches One-Stop Solution for Solar and Energy Storage Products

      October 24, 2023

      Comments are closed.

      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      What is Sustainable energy?

      December 7, 2022

      Solar Energy Storage Benefits

      December 23, 2022
      Don't Miss
      Energy Storage System

      Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

      By cindy kApril 25, 20250

      The Hidden Risk in Plain Sight: In the heart of every energy storage system lies…

      Why the OUPES Portable Power Station Is a Must-Have for Every Home

      April 23, 2025

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      How to Match Solar Capacity with Lithium Battery Capacity in Your Campervan

      February 23, 2024
      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Solar Energy Storage Benefits

      December 23, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      Subscribe to Updates

      Get the latest creative news from SmartMag about art & design.

      • sitemap

      Type above and press Enter to search. Press Esc to cancel.