Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

    April 25, 2025

    Why the OUPES Portable Power Station Is a Must-Have for Every Home

    April 23, 2025

    What Is a Hydrogen Energy Storage System and How Does It Work?

    April 14, 2025
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Home»Solar»Neoen wins big battery tender in Australia – pv magazine International
    Solar

    Neoen wins big battery tender in Australia – pv magazine International

    By June 20, 2023No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    French developer Neoen has received a 197 MW storage contract with the Australian Power Market Operator (AEMO). The deal is for the Collie massive battery in Western Australia, with the primary section set to start business operation in October 2024.

    June 20, 2023 David Carroll

    From pv journal Australia

    Neoen has secured a contract with AEMO to produce many of the capability within the first section for a big battery of 1 GW/4 GWh in Collie, Western Australia. The battery undertaking goals to unravel the photo voltaic duck curve and guarantee clean power provide.

    The preliminary capability of the Collie battery undertaking is about to be 219 MW/877 MWh, with 197 MW of storage capability contracted to AEMO. The settlement stipulates that the battery will cost in the course of the day, use excessive photo voltaic era, and discharge throughout peak demand at night time.

    With this contract underneath its belt, Neoen has now given the inexperienced gentle to expertise associate Tesla and development contractor UGL, owned by CIMIC Group, to begin development for the primary section. Neoen stated that the primary stage is anticipated to be accessible within the fourth quarter of 2024, however for the reason that contract with AEMO begins on October 1, 2024, this seems to be a tough deadline.

    A Neoen spokesperson stated Australia’s pv journal that it selected the dimensions of the battery with extra capability, 22 MW of the contracted 197 MW, to offer a “cheap buffer” to make sure that the contracted energy is delivered on the connection level.

    To proceed studying, please go to our Australia’s pv journal web site.

    This content material is protected by copyright and will not be reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: editors@pv-magazine.com.

    Source link

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

      Related Posts

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      MCPV to build 3 GW solar cell, module factory in Netherlands – pv magazine International

      July 17, 2023

      Fire hits industrial building, PV system in Switzerland – pv magazine International

      July 17, 2023

      Comments are closed.

      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      What is Sustainable energy?

      December 7, 2022

      Solar Energy Storage Benefits

      December 23, 2022
      Don't Miss
      Energy Storage System

      Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

      By cindy kApril 25, 20250

      The Hidden Risk in Plain Sight: In the heart of every energy storage system lies…

      Why the OUPES Portable Power Station Is a Must-Have for Every Home

      April 23, 2025

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      How to Match Solar Capacity with Lithium Battery Capacity in Your Campervan

      February 23, 2024
      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Solar Energy Storage Benefits

      December 23, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      Subscribe to Updates

      Get the latest creative news from SmartMag about art & design.

      • sitemap

      Type above and press Enter to search. Press Esc to cancel.