Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

    April 25, 2025

    Why the OUPES Portable Power Station Is a Must-Have for Every Home

    April 23, 2025

    What Is a Hydrogen Energy Storage System and How Does It Work?

    April 14, 2025
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Home»Solar Energy»Renewable Energy Update – November 2022 #2 | Allen Matkins
    Solar Energy

    Renewable Energy Update – November 2022 #2 | Allen Matkins

    By November 30, 2022No Comments4 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    purpose

    bullet KCET – November 17

    The California Air Sources Board has unveiled a brand new model of its technique for combating local weather change. If adopted by the air board at its December 15 assembly, the plan will radically rework California’s financial system, change how Californians’ automobiles, buildings, and home equipment are operated, and in the end serve which is a blueprint for different states and international locations to comply with. The plan units a extra aggressive aim of slicing carbon emissions 48% beneath 1990 ranges by 2030 – up from the 40% by 2030 required underneath state legislation – till reaching net-zero emissions by 2045. air board officers stated they’re assured that the state will be capable of meet the brand new goal due to the brand new mandates and insurance policies carried out this 12 months. State officers have halted gross sales of latest gas-powered automobiles by 2035, set stricter requirements for low-carbon fuels, and streamlined siting and allowing of renewable power initiatives.


    NEwS

    bullet Photo voltaic Trade Journal – November 14

    The US Division of Power has launched practically $350 million for creating long-term power storage demonstration initiatives able to delivering electrical energy for 10 to 24 hours or longer. extra to assist an reasonably priced, dependable, carbon-free electrical grid. The funding alternative will advance new renewable power applied sciences, enhance the capabilities of consumers and communities to combine grid storage extra successfully, enhance grid resilience, and extra. but.


    bullet PV-Tech – November 14

    The Worldwide Code Council (ICC) has permitted proposals from commerce physique Photo voltaic Power Industries Affiliation (SEIA) that designate US photo voltaic and storage initiatives as Threat Class 2 infrastructure, as a substitute of the strictest class. SEIA says that with out its intervention, a proposal from the Federal Emergency Administration Company would require photo voltaic, storage, and wind initiatives to satisfy the necessities of Threat Class 4 and be constructed to face up to damaging pure disasters. disasters greater than what is critical, leading to a dramatic enhance. of building prices.


    bullet OPB – November 11

    The US Division of Power has awarded Oregon State College (OSU) $3 million to discover the event of a brand new rechargeable battery expertise that may facilitate the transition to wash power with out counting on uncommon minerals corresponding to lithium, cobalt, and nickel. OSU researchers will discover anion batteries that present the required parts with out utilizing the restricted minerals utilized in lithium batteries and that may enhance how a lot power a battery can produce. .


    Tasks

    bullet Windpower Engineering – November 14

    Sample Power Group’s SunZia Transmission challenge acquired unanimous approval from the Arizona Company Fee in its current software for a Certificates of Environmental Compatibility, representing the completion of the state’s approval course of. The SunZia Wind challenge represents over 3,500 MW of latest renewable era situated in Torrance, Lincoln, and San Miguel Counties, making it the biggest wind challenge within the Western Hemisphere.


    bullet KOLO – November 14

    The Bureau of Land Administration is looking for public touch upon a photo voltaic power challenge in Nye County, Nevada. The Copper Rays Photo voltaic Undertaking will generate as much as 700 MW of electrical energy on greater than 5,100 acres of public land southeast of the city of Pahrump. Two public remark conferences will happen on December 6 and December 7.


    bullet Power Conservation Information – November 11

    Common Motors has partnered with San Diego Gasoline & Electrical, certainly one of California’s main investor-owned utilities, to discover the potential of vehicle-to-grid and vehicle-to-home battery integration. They’ll examine the potential for integrating bi-directional electrical automobiles to behave as an power useful resource for the grid. That features trying on the numerous concerns for {hardware}, software program, processes, and building wanted to allow vehicle-to-grid, the place power saved in automobiles can be utilized for the community.


    bullet Utility Dive – November 10

    Residential photo voltaic is booming within the US, and whereas that is a superb signal for buyer invoice financial savings and clear power era, the expansion additionally represents logistical complications for utilities tasked with figuring out whether or not the panels on the roof will be safely linked to their distribution techniques. The Sacramento Municipal Utility District (SMUD) and the Nationwide Renewable Power Laboratory (NREL) have developed a software to automate interconnection assessments and pace up the interconnection course of. Utilities obtain 1000’s of interconnection requests every week, and NREL stated the amount “exhibits no indicators of slowing.”

    Source link

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

      Related Posts

      Shenzhen Sunlith Energy Co., Ltd. Launches One-Stop Solution for Solar and Energy Storage Products

      October 24, 2023

      1st phase of Mexican solar project to be operating in April

      February 2, 2023

      Unitarian Universalists score solar panels with grant – The Campus

      February 2, 2023

      Comments are closed.

      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      What is Sustainable energy?

      December 7, 2022

      Solar Energy Storage Benefits

      December 23, 2022
      Don't Miss
      Energy Storage System

      Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

      By cindy kApril 25, 20250

      The Hidden Risk in Plain Sight: In the heart of every energy storage system lies…

      Why the OUPES Portable Power Station Is a Must-Have for Every Home

      April 23, 2025

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      How to Match Solar Capacity with Lithium Battery Capacity in Your Campervan

      February 23, 2024
      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Solar Energy Storage Benefits

      December 23, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      Subscribe to Updates

      Get the latest creative news from SmartMag about art & design.

      • sitemap

      Type above and press Enter to search. Press Esc to cancel.