Tunisia’s Ministry of Vitality, Mines and Renewable Energies has launched two new tenders to deploy 1 GW of PV capability.
Within the first procurement, the Tunisian authorities requested for proposals to construct eight photo voltaic vegetation with a capability of 100 MW. Builders are liable for figuring out and securing land for tasks.
The tender can be carried out in 4 completely different phases. The deadline for submitting mission proposals for the primary part is ready for June 15, 2023. For the fourth and last part, the submission date is ready for an undetermined date of September 2025.
Within the second tender, the Tunisian authorities needs to speed up the development of two 100 MW photo voltaic vegetation in Heno, on Items governor, and Khobna, in Governor of Sidi Bouzid.
builders have till Could 18 to submit their proposals. The federal government didn’t disclose every other particulars in regards to the procurement workout routines. The sthe chosen tasks will probably promote electrical energy to the Tunisian Electrical energy and Fuel Firm (STEG), the Tunisian state-owned grid operator, beneath long-term energy buy agreements.
Tunisia is supporting utility-scale photo voltaic by means of a collection of 70 MW tenders. It additionally concluded a 500 MW photo voltaic tender in December 2019. The nation’s cumulative put in PV capability stands at 95 MW by the tip of 2021, based on the Worldwide Renewable Vitality Company (IRENA).
This content material is protected by copyright and will not be reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: editors@pv-magazine.com.