From pv journal India
Adani Inexperienced Power Ltd. (AGEL), the renewables unit of the Adani Group, has turn into the world’s largest wind-solar hybrid energy developer with the commissioning of its third wind-solar hybrid energy plant in Rajasthan’s Jaisalmer district.
The developer already has a cumulative operational hybrid capability of 1,440 MW, together with the newly commissioned 450 MW energy plant in Jaisalmer.
The Jaisalmer plant consists of 420 MW of photo voltaic and 105 MW of wind. It has an influence buy settlement with Photo voltaic Power Corp. of India (SECI) at a tariff charge of INR 2.67 ($0.032)/kWh for 25 years.
AGEL’s different two operational wind-solar vegetation embrace 390 MW and 600 MW in Jaisalmer. It ordered the vegetation in Could and September, respectively. The corporate at present has a complete working capability of seven.17 GW.
This content material is protected by copyright and might not be reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: editors@pv-magazine.com.