From pv journal Italy
Aura Energy mentioned in a latest assertion that it plans to construct a 200 MW / 800 MWh storage mission in Maddaloni, within the southern province of Benevento in Italy. It mentioned that it has acquired remaining approval for the mission.
The corporate mentioned it expects to start out development in 2025. Italian regulation agency Legance and engineering agency 3E Ingegneria will help Aura Energy in growing the ability.
“Right now the Maddaloni mission is a actuality because of the anticipated method of Aura Energy,” mentioned Cristina Martorana, a Legance associate.
Aura Energy has greater than 20 GW of photo voltaic and battery power storage tasks below improvement in Europe and North America.
Italy is at present making ready an public sale scheme for large-scale storage that could possibly be launched in 2024.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.