From pv journal India
SECI has launched a young to construct a 100 MW (AC) floating photo voltaic mission at Getalsud Dam, Ranchi district, Jharkhand.
The contract will embrace engineering, provide, development, and commissioning of the floating photo voltaic mission, together with 10 years of plant operation and upkeep. The mission should be commissioned inside 18 months after signing the contract.
SECI has already secured financing from the World Financial institution. Potential bidders have till Might 2 to submit their proposals.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.