Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    IMR Metal Powder is latest Zinc Battery Initiative member

    July 20, 2023

    Altilium in £1m grants boost for recycling plans

    July 20, 2023

    Narada BESS order part of 5.5GWh of deals for 2023

    July 20, 2023
    Facebook Twitter Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook Twitter Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Home»Solar Energy»Solar-wind hybrid project finally ready to go in Australia – pv magazine International
    Solar Energy

    Solar-wind hybrid project finally ready to go in Australia – pv magazine International

    cindy kBy cindy kNovember 21, 2022No Comments3 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    After nearly four years of delay, the solar-wind hybrid 60 MW Kennedy Energy Park in the Australian state of Queensland is nearing full operation after project developer Windlab confirmed the final stage of testing and commissioning of the Australian-first hybrid project is ongoing.

    November 21, 2022 David Carroll

    from Australia’s pv magazine

    Australian renewables developer Windlab is confident that the $106 million Kennedy Energy Park (KEP), which combines 43 MW of wind, 15 MW of solar, and a 2 MW/4 MWh battery, will begin full commercial operation in early 2023 with the project currently progressing through the final testing and commissioning phase.

    Windlab Operations General Manager Mark Pickering said Australia’s pv magazine that KEP, near Hughenden in central north Queensland, is now fully operational and initial hold-point tests, 10 MW and 25 MW, have been completed with the facility now authorized to operate on 25 MW, which exports 80% of the energy that the facility is expected to produce with a total capacity of 50 MW.

    “KEP has one more hold point to complete, HP3 at 50 MW, which is the rated capacity of the connection,” he said. “We are waiting for the go-ahead from AEMO and Energy Queensland to do this trial. We hope to receive approval before the end of the year,” he said.

    The energy park was hailed as Australia’s first major grid project to integrate wind, solar and battery technologies when it was completed in late 2018, but its commercial operation has been delayed due to complications in the process. in connection. The plant was eventually energized in August 2019 but did not get its registration from the Australian Energy Market Operator (AEMO) until June 2021.

    Pickering said the ongoing hold-ups are related to the finalization of the electrical model rather than the design of the plant.

    “AEMO and Energy Queensland required a complex set of scenarios to be developed that took longer than expected,” he said.

    Windlab’s Mark Pickering (right) speaks with Queensland Employment Minister Di Farmer during a visit to the KEP site.

    A 50-50 joint venture between Windlab and Japan-based energy company Eurus Energy, KEP is now expected to begin full commercial operations in early 2023.

    The project is backed by a 10-year power purchase agreement with Queensland state-owned generator CS Energy that includes 100% of KEP’s output.

    The KEP update comes just days after Windlab announced it would partner with Fortescue Future Industries (FFI) to develop the North Queensland Super Hub in the Hughenden region. The goal is to unlock more than 10 GW of wind and solar energy within the next 10 years to support the industrial production of green hydrogen.

    Windlab Chief Executive John Martin said the projects were a big step towards the company realizing its ambition to provide 20% of new generation green energy in Australia over the next 10 years.

    “The enormous renewable energy potential of Hughenden and the Flinders Shire means that this region is a strategically critical part of our development strategy,” he said.

    This content is protected by copyright and may not be reused. If you want to cooperate with us and want to reuse some of our content, please contact: editors@pv-magazine.com.

    Source link

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
    cindy k

      Related Posts

      1st phase of Mexican solar project to be operating in April

      February 2, 2023

      Unitarian Universalists score solar panels with grant – The Campus

      February 2, 2023

      Solar industry group expects some IRS guidance by Feb. 13 on renewable energy tax credits, with more later

      February 2, 2023

      Leave A Reply Cancel Reply

      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      What is Sustainable energy?

      December 7, 2022

      Solar Energy Storage Benefits

      December 23, 2022
      Don't Miss
      Solar Products

      IMR Metal Powder is latest Zinc Battery Initiative member

      By July 20, 20230

      July 20, 2023: IMR Steel Powder Applied sciences has turn out to be the sixteenth…

      Altilium in £1m grants boost for recycling plans

      July 20, 2023

      Narada BESS order part of 5.5GWh of deals for 2023

      July 20, 2023

      Freyr gets €100m EU grant for Giga Arctic project

      July 20, 2023
      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Solar Energy Storage Benefits

      December 23, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      Subscribe to Updates

      Get the latest creative news from SmartMag about art & design.

      • sitemap

      Type above and press Enter to search. Press Esc to cancel.