The BCDA has issued a young for the development of a 25 MW solar energy plant in New Clark Metropolis, Tarlac province, Philippines. The authority, which is in control of the transformation of former navy bases and properties into industrial and financial facilities, leased a 37-hectare website for the venture. Potential builders have till April 21 to submit their bids.
“BCDA gives an preliminary lease interval of 25 years and might be renewed for an additional 25 years, upon settlement of the events,” stated the tender doc.
In 2021, BCDA signed an settlement on Sunray Energy Inc. (SPI) to lease a 260-hectare space of New Clark Metropolis for the development of a 100 MW photo voltaic facility. Earlier, BCDA additionally signed a lease settlement with SSR C-Photo voltaic Energy Inc. for a 20 MW photo voltaic farm. The initiatives will probably be in-built what BCDA calls “buffer zones” in chosen areas, to maximise their use via rental.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.