Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

    April 25, 2025

    Why the OUPES Portable Power Station Is a Must-Have for Every Home

    April 23, 2025

    What Is a Hydrogen Energy Storage System and How Does It Work?

    April 14, 2025
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Home»Solar»Developer starts building 800 MW project with US components in Illinois – pv magazine International
    Solar

    Developer starts building 800 MW project with US components in Illinois – pv magazine International

    By March 30, 2023No Comments3 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Swift Present Power is scheduled to start development on an 800 MW undertaking within the fall of 2024.

    March 30, 2023 Michael Schoeck

    From pv journal USA

    Swift Present Power, a Boston-based photo voltaic and wind undertaking developer, has begun development on the Double Black Diamond photo voltaic undertaking in Illinois, an 800 MW(DC) utility-scale photo voltaic undertaking that would be the largest photo voltaic undertaking in the US. United States. and the primary to make use of solely US-made modules, {hardware} and electrical parts.

    The undertaking is scheduled to be constructed within the fall of 2024, and will probably be owned by the developer as soon as it’s out there. First Photo voltaic offered 1.6 million US-made photo voltaic panels and Nextracker equipped US-made monitoring methods for the undertaking.

    The developer not too long ago tapped McCarthy Constructing Firms because the undertaking’s engineering, procurement and development (EPC) contractor. Development is anticipated to final 14 months.

    The undertaking checks just a few extra containers for US Inflation Discount Act initiatives and rebates. The undertaking units apprenticeship, in addition to variety, fairness, and inclusion hiring objectives, sponsored by native unions for carpenters, laborers, operators, electricians, and crew.

    In partnership with native unions, McCarthy will practice staff with no expertise in utility-scale photo voltaic development to assist meet future workforce wants and accommodate the exponential regional and nationwide development of the photo voltaic business. As soon as operational, Double Black Diamond will present sufficient clear power to energy greater than 85,000 Illinois properties annually.

    In partnership with Constellation Power, an Exelon firm, the town of Chicago will probably be an vital offtake buyer. Beginning in 2025, the town will partially supply main power makes use of akin to Chicago O’Hare Worldwide Airport and Halfway Worldwide Airport with renewable power from Double Black Diamond. The undertaking is anticipated to convey $100 million in tax income to Sangamon Counties and Morgan county, the place the undertaking is positioned.

    “As one of many largest customers of Double Black Diamond, the Metropolis of Chicago is proud to assist a undertaking that can generate photo voltaic power proper right here in Illinois and will probably be constructed based on our shared labor and fairness objectives,” stated Angela Tovar, chief sustainability officer at Chicago’s Workplace of Local weather and Environmental Fairness.

    Further offtake clients for the large undertaking embody State Farm Insurance coverage, which is able to get about 103,000 MWh of fresh power yearly from Constellation as a part of its efforts to scale back its environmental footprint.

    This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.

    Source link

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

      Related Posts

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      MCPV to build 3 GW solar cell, module factory in Netherlands – pv magazine International

      July 17, 2023

      Fire hits industrial building, PV system in Switzerland – pv magazine International

      July 17, 2023

      Comments are closed.

      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      What is Sustainable energy?

      December 7, 2022

      Solar Energy Storage Benefits

      December 23, 2022
      Don't Miss
      Energy Storage System

      Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

      By cindy kApril 25, 20250

      The Hidden Risk in Plain Sight: In the heart of every energy storage system lies…

      Why the OUPES Portable Power Station Is a Must-Have for Every Home

      April 23, 2025

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      How to Match Solar Capacity with Lithium Battery Capacity in Your Campervan

      February 23, 2024
      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Solar Energy Storage Benefits

      December 23, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      Subscribe to Updates

      Get the latest creative news from SmartMag about art & design.

      • sitemap

      Type above and press Enter to search. Press Esc to cancel.