From pv journal LatAm
Ecuador’s Ministry of Power and Mines (MEM) has allotted 120 MW of PV capability within the newest 500 MW renewable vitality public sale, launched in December 2021. It initially chosen 345.3 MW of tasks in PV and accepted six bids for photo voltaic crops with measurement. from 3 MW to 50 MW.
For photo voltaic, 5 of the six collaborating builders proposed 60 MW tasks. Intiyana submitted a proposal of $0.049877/kWh and AMBI offered a bid of $0.049876/kWh. Imbabura Photo voltaic, Ñañapura, and Dominion supplied $0.0535977/kWh, $0.05961/kWh, $0.066988/kWh, respectively. Esco As submitted a 60 MW photo voltaic undertaking to promote electrical energy at $0.064985/kWh.
Solely two of those tasks had been finally chosen within the procurement train – the Dominion plant at $0.066988/kWh and the Esco undertaking supply at $0.064985/kWh.
MEM additionally allotted 150 MW of hydropower capability, 200 MW of put in wind energy, and 30 MW of biomass capability. It stated it will likely be awarded a 25-year PPA on wind and photo voltaic tasks and a 30-year deal on hydroelectric amenities.
This content material is protected by copyright and will not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.