From pv journal Spain
Madrid plans to open Spain’s first inexperienced hydrogen plant to make use of reclaimed water. The plant will start operations in 2024 on the Arroyo Culebro Cuenca Media Alta wastewater remedy facility in Pinto. Will probably be constructed by Canal de Isabel II, a water administration firm owned by the town of Madrid.
The venture, with an preliminary capability of roughly 80,000 kilos of hydrogen per 12 months, stands out for a number of causes. First, hydrogen is produced from reclaimed water and undergoes additional remedy by way of electrolysis. The Madrid authorities says it’s the largest inexperienced hydrogen era plant in Spain that may use recycled water.
It is going to additionally mix two renewable applied sciences – photo voltaic era and biogas cogeneration, utilizing waste from the remedy plant itself. The oxygen generated throughout electrolysis will even enhance the purification of wastewater remedy, enhancing the ability’s potential to handle the air pollution produced by 1.2 million residents.
By implementing the tertiary remedy, the Canal de Isabel II will provide the mandatory water to the electrolyzer, with 12 liters of water wanted to supply 1 kilogram of hydrogen. The venture includes an funding of €7.3 million ($7.8 million) and is anticipated to be accomplished within the subsequent 13 months.
As well as, the wastewater remedy plant has the capability to supply as much as 30 million liters of standard reclaimed water per day. It is going to use ultrafiltration membranes and reverse osmosis for functions comparable to watering inexperienced areas or cleansing streets.
This content material is protected by copyright and might not be reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: editors@pv-magazine.com.