Maxeon has accomplished a $70 million renovation mission to deliver the capability of its module plant in Mexicali, Mexico, as much as 1.8 GW. The module plant improve plan was first reported by pv journal two years in the past.
Maxeon additionally has a second manufacturing facility in Ensenada, in the identical state of Baja California. The mixed capability of its two module vegetation in Mexico is 2.5 GW, with about 2,000 staff.
The corporate stated in a press release that it has made cumulative investments of greater than $260 million within the area. It claims its Mexicali location is now one of many “largest photo voltaic panel manufacturing services” in America.
“Due to its proficient workforce, its privileged geographical location, and a positive enterprise atmosphere, immediately Baja California performs and can proceed to play a extra necessary position in assembly the rising demand for our merchandise in North America and the remainder of the world within the coming years,” stated Maxeon CEO Invoice Mulligan.
This content material is protected by copyright and might not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.