Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

    April 25, 2025

    Why the OUPES Portable Power Station Is a Must-Have for Every Home

    April 23, 2025

    What Is a Hydrogen Energy Storage System and How Does It Work?

    April 14, 2025
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    Solar Energy Tech News
    • Solar
    • Solar Batteries
    • Solar Energy
    • Solar Inverter
    • Solar Products
    Solar Energy Tech News
    Home»Solar Energy»Luna County postpones approval of solar project permit
    Solar Energy

    Luna County postpones approval of solar project permit

    By January 14, 2023No Comments5 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    A brand new board of county commissioners took their seats on January 12, with two of its three members, Colette Chandler and Ray Trejo, newly elected. They opened their first time period by electing their senior colleague, District 3 Commissioner John Sweetser, as chairman.

    In an indication of renewed management, commissioners posted a particular use allow for the most recent photo voltaic vitality challenge to return earlier than them, heeding calls from residents attending for a extra deliberative method to requests from photo voltaic builders.

    County Supervisor Chris Brice stated “45 or so” photo voltaic builders are at present testing the waters for photo voltaic vitality improvement within the county, though the quantity with critical plans is small.

    On Thursday’s agenda is a particular use allow for the South Peak challenge, a 97.5 megawatt direct present/75 megawatt alternating present facility deliberate for 620 acres of personal land close to New Mexico Freeway 11 and Camino Doce Highway owned by James Koenig. The challenge is scheduled to be accomplished by December 2025.

    The developer, Galehead Improvement of Boston, Mass., instructed the county it has negotiated a purchase order settlement with Public Service Co. of New Mexico (PNM) to promote energy to the utility and is predicted to signal an interconnection settlement in February, whereas building is deliberate to start subsequent January.

    A number of members of the general public have raised questions in regards to the challenge’s impacts in addition to a sign within the allow software that Galehead will search industrial income bonds to assist finance the challenge. Final month, the earlier board of commissioners authorized IRBs for the Carne Photo voltaic Venture northeast of Deming over objections from individuals who spoke at that assembly, a lot of whom returned on January 12 to ask about South Peak.

    Order was repeatedly damaged through the assembly as residents in attendance interjected all through the assembly with questions or feedback about a number of gadgets on the agenda, which included a chance for public remark.

    Typically, Brice and Sweetser indulged in interruptions and answered questions, at different occasions calling for order and reminding the general public that supplies had been obtainable for public assessment earlier than the conferences. One individual was quickly faraway from the chamber by sheriff’s deputies when he refused to sit down down after Sweetser tried to get the assembly again on observe.

    Luna County Commissioner Colette Chandler is seen on the finish of the board of commissioners assembly on January 12, 2023. (Headlight workers photograph by Algernon D’Ammassa)

    Earlier within the assembly, County Clerk Berenda McWright took a second after receiving an award for 10 years of county service to handle the disruptions, saying, “These conferences are enterprise conferences … and these commissioners are elected to symbolize you. When you have a difficulty with something on the agenda, it is your job as a member of the general public, in addition to their job, to do your homework, to return right here with an concept of ​​what every agenda merchandise is about. to have some type of perspective on how you’re feeling about it.”

    He directed the general public to the county’s web site, which posts agendas in addition to packets for commissioners’ conferences at https://www.LunaCountyNM.us/authorities/meeting_minutes.php.

    Wesley Mild, a county resident who disclosed that his personal property is absolutely powered by photo voltaic vitality panels, cautioned commissioners about offering price incentives for photo voltaic builders, arguing that there isn’t any incentives are wanted to draw photo voltaic vitality improvement to Luna County and that trade income. The bonds authorized for Carne Photo voltaic are a type of public subsidy.

    “If these subsidies proceed, you are creating a synthetic financial system,” Mild stated, calling on commissioners to think about delaying motion as a substitute of approving the allow software that mentions IRBs. (The bonds themselves would require separate fee motion, together with a name for an ordinance and a public listening to.)

    Chandler moved to postpone any motion on the allow, saying he acknowledges that whereas personal landowners have the best to welcome photo voltaic improvement on their property, the county has a task in set up the phrases for the mandatory approvals. “Photo voltaic is coming, whether or not we prefer it or not,” he stated. “We’ve to take care of it correctly.”

    Luna County Commissioner John Sweetser was elected chairman on the board’s first assembly of 2023 on January 12. (Headlight workers photograph by Algernon D’Ammassa)

    Trejo responded that he agreed to postpone it, saying he wished to “go sluggish to go quick” and take a thought of method to permits and different requests.

    With Sweetser becoming a member of them, the board voted unanimously to postpone the appliance.

    Following the assembly, the corporate’s senior challenge improvement supervisor, Ben Luxenberg, commented, “Galehead Improvement stays dedicated to the challenge and appears ahead to efficiently working with and investing in Luna County.”

    Algernon D’Ammassa could be reached at [email protected]



    Source link

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

      Related Posts

      Shenzhen Sunlith Energy Co., Ltd. Launches One-Stop Solution for Solar and Energy Storage Products

      October 24, 2023

      1st phase of Mexican solar project to be operating in April

      February 2, 2023

      Unitarian Universalists score solar panels with grant – The Campus

      February 2, 2023

      Comments are closed.

      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      What is Sustainable energy?

      December 7, 2022

      Solar Energy Storage Benefits

      December 23, 2022
      Don't Miss
      Energy Storage System

      Beyond the Cell: Why Whole-System Testing Matters in Energy Storage System

      By cindy kApril 25, 20250

      The Hidden Risk in Plain Sight: In the heart of every energy storage system lies…

      Why the OUPES Portable Power Station Is a Must-Have for Every Home

      April 23, 2025

      What Is a Hydrogen Energy Storage System and How Does It Work?

      April 14, 2025

      How to Match Solar Capacity with Lithium Battery Capacity in Your Campervan

      February 23, 2024
      Our Picks

      The Benefits Of using LiFePO4 battery For Solar Energy Storage

      December 27, 2022

      Solar Energy Storage Benefits

      December 23, 2022

      Battery Energy Storage Solutions (BESS)

      December 14, 2022

      Subscribe to Updates

      Get the latest creative news from SmartMag about art & design.

      • sitemap

      Type above and press Enter to search. Press Esc to cancel.